Most NDIS audits find something. What matters is the kind of finding. This guide explains what an NDIS major nonconformity and an NDIS minor nonconformity mean, how long you have to close each one, what evidence closes them, how they affect your registration decision and how to write a corrective action plan. Official documents spell it "non-conformity"; you will see both spellings.

First, some reassurance from the NDIS Commission: "If a non-conformity is raised, it does not mean you've failed. It means something needs to be corrected or strengthened."

How auditors rate each standard

Approved quality auditors rate how well you meet each outcome and indicator in the standards that apply to you. The rules they work under, the NDIS (Approved Quality Auditors Scheme) Guidelines 2018, use a four-point scale:

  • 3, conformity with elements of best practice: you clearly meet the criteria through innovative, responsive service delivery underpinned by continuous improvement.
  • 2, conformity: you clearly demonstrate that the outcomes and indicators are met, risk is negligible and certification can be recommended.
  • 1, minor nonconformity
  • 0, major nonconformity

The ratings go into the audit report submitted to the Commission. The Commission's Types of audits page summarises the scale and links to the guidelines.

What is an NDIS minor nonconformity?

A minor nonconformity (rating 1) requires a corrective action plan that reduces the likelihood of the identified risks occurring or affecting participant safety. The guidelines say one of two situations usually applies:

  • an appropriate process, system or structure has been implemented, but without the required supporting documentation, or
  • a documented process, system or structure exists, but the provider cannot demonstrate implementation, review or evaluation where that is required.

In plain terms: you do it but cannot prove it, or you wrote it down but cannot show you do it. Examples could be a worker who handles complaints well but leaves no record, or a risk register that has not been reviewed since it was set up.

What is an NDIS major nonconformity?

A major nonconformity (rating 0) is given when the provider cannot demonstrate appropriate processes, systems or structures to meet the outcome and indicators, or when the gaps present a high risk. The guidelines add that three minor nonconformities within the same module may also amount to a major nonconformity.

The practical difference is serious: a rating of 0 rules out a recommendation for certification until it is addressed.

Opportunities for improvement are not nonconformities

Audit reports also identify opportunities for improvement. These are suggestions rather than failures to meet a standard, and the deadlines below do not apply to them. They are still worth acting on, because they show your next auditor that you use feedback to improve.

Timeframes to close nonconformities

Annex C of the guidelines sets the timeframes. As at November 2026 they are:

  • Corrective action plan: due to your auditor within seven calendar days of written notification of the nonconformity.
  • Major nonconformity: must be downgraded or closed within three calendar months of the first written notification. The auditor carries out a desktop review of your implemented corrective actions within three months of receiving your plan, and follows up onsite if needed.
  • Minor nonconformity: must be closed out within 18 calendar months of the first written notification, and is checked at your mid-term or recertification audit, whichever comes first. If it is still open, it is escalated to a major nonconformity.
  • Escalated minor: once escalated, it must be closed within three calendar months and cannot be downgraded back to a minor.
  • Downgraded major: if a major is downgraded to a minor, it must be closed within 12 calendar months of the original finding.

Missing these later deadlines has real consequences. A major raised at a mid-term or recertification audit that is not downgraded or closed within three months, an escalated minor not closed within three months, or a downgraded major not closed within 12 months all result in automatic suspension of the auditor's certification decision. The auditor must notify the Commission seven calendar days before suspending a decision. The wording of Annex C is dense, so confirm your exact due dates with your auditor in writing.

How nonconformities affect your registration decision

At your initial audit, the auditor can only recommend certification or verification when you meet all criteria in the applicable standards at the level of conformity, with one exception. They may still recommend you where minor nonconformities were found, as long as you have shown them evidence of an acceptable corrective action plan before the recommendation is made.

Major nonconformities are different. The Commission says that if you get a major nonconformity rating in any area you have three months to fix it, and your registration will not progress until it is addressed and the quality audit is successfully completed. With a minor nonconformity you have longer to fix the issue and can continue with the registration process.

Nonconformities also follow you through your registration period:

  • Any outcome where a major or minor nonconformity was raised is audited again at your mid-term or recertification audit, whichever comes first, to check the corrective action has been put into practice.
  • The NDIS mid-term audit for certification providers covers governance and operational management plus any standard that previously needed a corrective action plan.
  • The Commission may impose a condition audit during your registration if you have minor nonconformities outstanding.

The auditor makes a recommendation, but the Commission makes the registration decision, which also includes its assessment of your suitability and your key personnel. Our guide to getting your NDIS certificate of registration covers that final step.

What evidence closes a nonconformity

A nonconformity closes when the auditor is satisfied the gap is fixed. The guidelines say follow-up should be done in the most cost-effective way, which may mean a desktop review of documents supplemented by telephone interviews with workers and participants. Plan for both: paper evidence, and people who can explain the change.

Match the evidence to the type of finding:

  • Missing documentation: provide the record, plus proof that the process now produces it every time, such as completed forms dated after the finding.
  • No evidence of implementation or review: show the process in use over time. Register entries, training attendance records, supervision notes, meeting minutes and reviewed policies with version dates all help.
  • A missing system: show the new policy and procedure, the training given to workers and the first records of it in use.

The Commission says auditors are "looking for evidence that your systems are working, not just that they exist", so a new policy on its own is unlikely to be enough. Our guide to NDIS audit documents lists the records auditors commonly ask for.

How to write a corrective action plan for an NDIS audit

The guidelines define a corrective action plan as an action plan developed by the provider that sets out the corrections and corrective actions it will take to address identified nonconformities. If your auditor gives you a template, use it. Either way, cover these points for each finding:

  1. The finding: the standard or indicator, the rating and the auditor's finding statement, quoted exactly.
  2. The correction: what you will do straight away to fix the specific instance, such as completing the missing record.
  3. The root cause: why it happened. Keep asking "why" until you reach a system cause, such as no step in the induction checklist or no one responsible for the register.
  4. The corrective action: the change that stops it happening again, such as a revised procedure, a new checklist step or training.
  5. Who and when: one responsible person and a due date inside the timeframes above.
  6. Evidence: the specific documents or records you will send to close it.
  7. Effectiveness check: when and how you will confirm the fix has worked, such as a sample check of files three months later.

Keep the plan specific and realistic. A short plan with dates you meet is stronger than an ambitious one that slips. Record each action in your continuous improvement register so it becomes part of your normal quality system, and keep the closed plan with your audit records for your next audit.

Reducing nonconformities before your audit

The best time to find a nonconformity is before the auditor does. Rate yourself on the same 0 to 3 scale, fix anything you would score 0 or 1, and check that your staff can explain your key processes. Our guide to NDIS audit questions shows what auditors typically ask and the evidence that answers them.

Related reading: How to Prepare Your NDIS Registered Training Organisation for Sale

Related reading: Inclusive Group Fitness Activities for Disability Support Workers

Ready to get audit-ready without the paperwork?

Get the Certification Pack ($649)